Ohne Wasser Kein Beton.Without water no pouring concrete.
The supply of building materials on top of the Farrenberg was done by horse cart and mechanical elevators. Pouring concrete is a continuous process. Water was stored in these reservoirs to keep the pouring process going. Multiple reservoirs can be seen on the walk.
Do you have more information about this location? Inform us!